ZIMBABWE: Mukuyu-1 and sidetrack final well results and Exalo Rig 202 secured for further 12 months
Since the last update, the drill string was rigged up to conduct fishing operations to attempt to retrieve the wireline formation testing tool. The drill string with the overshot was … Read More