Description
Uganda upstream outlook looks at the way forward following the granting of a farm-out by Tullow Oil in the albertine basin to Total holding about 1.6 billion barrels in 2020 and the expected FID in 2021. It analyses progress made to the start of the construction of the East Africa Crude Oil Pipeline (EACOP) , the Albertine Refinery and the Petrochemical Industrial Park.
Reviews
There are no reviews yet.